  Project Background:HBL established operations in Pakistan in 1947 and moved its head office to Karachi.Our first international branch was established in Colombo,Sri Lanka in1951 and Habib Bank Plaza was built in 1927 to commemorate the bank’s 25th Anniversary. With a domestic market share of over 40%,HBL was nationalized in 1974 and it continued to dominate the commercial banking sector with a major market share in inward foreign remittances(55%) and loans to small industries,traders and farmers.International operations were expanded to include the USA,Singapore,Oman,Belgium,Seychelles and Maldives and the Netherlands.


  Project Configuration:35.6kW precision cooling system


  Project Summary:Critical space in data center is considered an area that houses sensitive electronic equipment that manages no-going operations vital to the success of a bank.If the temperature of a critical area is too high or too low,data integrity and operating reliability can be compromised.Controlling relative humidity of critical areas is just as important as regulating their temperature.Too much humidity can corrode contacts and components,not enough humidity causes damaging static electricity.So Hairf precision air conditioner can help the data center of bank at a stable and safe status so as to make the bank operates smoothly.